July 4, 2005 After a succesfull on-site installation, start-up and tuning of the 2000-series E-Crane® during the month of june, the Point Tupper Marine Terminal is now ready to provide greater access to vessel optionality! Be social and share E-Crane® arrived and is being installed on the Nova Scotia Power site All Posts Carinox site will have the capacity to produce one million tons of stainless steel