Friday, January 18th, the first steps of the Blockbuster disassembly began at the Port of Rotterdam. The main boom was first to be removed with the help of two on-site cranes. After several other components of the heavily modified E-Crane were disassembled, pieces of the Blockbuster were loaded for transport. This unique E-Crane, which built the hard sea defense at Maasvlakte 2, will soon get a second life in the Caspian Sea.
[frame link=”http://www.e-crane.com/wp-content/uploads/2013/01/P1050427.jpg” linking=”lightbox” lightbox_group=”blockb-disassembly”...